Client Steel Arequipa
Location Pisco – Perú
Date 2020
Caudal PTAR1 125 m3/day – 50 Kg/ day of DBO
Caudal PTAR2 205 m3/day
Load 65 Kg/ day of DBO
Solution PTAR

Domestic Wastewater Treatment Plant

Implementation of 2 domestic wastewater treatment plants considering MBBR technology.

The scope of the project addresses the development of detailed engineering, supply, construction of civil works, assembly and commissioning of the treatment system. The plants are made up of the feed pumping system, equalization tank, aeration tank, secondary clarifier, sludge thickener, disinfection chamber and sludge drying beds.

As a complement, Ecopreneur develops the construction of the associated civil works: Support slabs, tanks, pumping chambers and sewage network.

Back to list

Projects