Client TECNOFAST – Quellaveco 
Location MOQUEGUA – Perú
Date 2018
Plant capacity 67.5 m3/day
Solution Potabilization
Drinking water plant, Camp Caracoles
Treatment system for the removal of suspended solids and turbidity through multimedia filters
and a disinfection system.
The scope of this project covers the development of detailed engineering, equipment supply,
installation and commissioning.



								
															
				
				
				
				
				
				
				
				
				
				
				
				
				
				
				
				
				
				
				